How we quote a GTA landscape project.
Every project starts with what the yard actually needs to do. From there we work through base, scope, and material — and only then do we talk price.
Different uses need different base logic.
Walkway, backyard patio, large-format slab patio, driveway, and heavy-use zones don't get priced the same way. Base depth, drainage, and access detail get decided here first.
Cost follows the build sequence.
Base depth, compaction, access, and how much real excavation a site needs — that's where most quote spread comes from, not the paver itself.
Every line on paper, before we start.
Area, excavation, base, bedding, drainage, edge restraint, material, disposal, warranty, exclusions — all visible in the PDF you sign.
Pick by use case before brand.
Unilock, Techo-Bloc, BWS, Oaks, Permacon — all good. But not interchangeable. The right pick depends on use, supply, and how the base is built.
From driveways to fences, end to end.
The visuals below are the same ones we walk through on site — to keep base, scope, and material decisions in plain view before any price is written.